Supply Chain-Management-Case-Study

International Healthcare Company*

“Global Network Optimization” *Due to confidentiality, we do not disclose the names of healthcare companies Customer said:  Analyze our distribution network to determine the optimal number of and locations for our distribution centers in North America, EMEA, and APAC. The… […]

Igloo

“Identify and Reduce Waste” Igloo said: Improve our production efficiency, and help reduce waste in the production process for a primary family of coolers. The engineers at Scott Sheldon said: We can do that. Project background Igloo Products Corporation contracted… […]

Newell Rubbermaid

“Australia Network Modeling” Newell said:  Determine our best APAC – Australia network and if outsourcing DC operations makes sense? The engineers at Scott Sheldon said:  We can do International as well as Domestic network assessments! Project background Newell’s’s APAC business… […]

Pier 1 imports

“Determine the Best DC Network” Pier 1 Imports said: Help us determine the best DC network to support our East Coast and Midwest store delivery and service requirements. The engineers at Scott Sheldon said: We can do that. Project background… […]

Global Healthcare Distributor

“Strategy for Future Growth” *Due to confidentiality, we do not disclose the names of healthcare companies Global Healthcare Distributor said: Help us design a new supply chain network strategy that provides us with a cost effective, leading-edge logistics capability that supports our… […]

Igloo

“Keeping Our Cool” Igloo said: Improve our distribution efficiency and capacity issues before the seasonal rush begins. Scott Sheldon engineers said: We can do that. Project background Igloo Products Corporation contracted Scott Sheldon to identify and implement improvements within their distribution… […]

Accretive Commerce

“Do More. Cost Less.” Accretive said: Analyze our distribution network to determine the optimal number of, and locations for our distribution centers; we want to better serve our Tier 1 customers and reduce distribution expense by a target of 25%. Scott… […]

Rubbermaid

“Cost Containment” Rubbermaid said: Implement a best practices model that yields 5% -10% cost reduction in the next two years. Scott Sheldon engineers said: We can do that. Project background Rubbermaid initiated a project to standardize warehouse management operations across eight of… […]